live chat

SEARCH RESULTS - You are one step closer to winning a government bid!

Not the Results You Wanted?    MODIFY SEARCH Or Call (866) 459-8947 for help refining your search and account preferences.

The Sector as a Whole The construction sector comprises establishments primarily engaged in the construction of buildings or engineering projects (e.g., highways and utility systems). Establishments primarily engaged in the preparation of sites for new construction and establishments primarily engaged in subdividing land for sale as building sites also are included in this sector. Construction work done may include new work, additions, alterations, or maintenance and repairs. Activities of these establishments generally are managed at a fixed place of business, but they usually perform construction activities at multiple project sites. Production responsibilities for establishments in this sector are usually specified in (1) contracts with the owners of construction projects (prime contracts) or (2) contracts with other construction establishments (subcontracts). Establishments primarily engaged in contracts that include responsibility for all aspects of individual construction projects are commonly known as general contractors, but also may be known as design-builders, construction managers, turnkey contractors, or (in cases where two or more establishments jointly secure a general contract) joint-venture contractors. Construction managers that provide oversight and scheduling only (i.e., agency) as well as construction managers that are responsible for the entire project (i.e., at risk) are included as general contractor type establishments. Establishments of the "general contractor type" frequently arrange construction of separate parts of their projects through subcontracts with other construction establishments. Establishments primarily engaged in activities to produce a specific component (e.g., masonry, painting, and electrical work) of a construction project are commonly known as specialty trade contractors. Activities of specialty trade contractors are usually subcontracted from other construction establishments, but especially in remodeling and repair construction, the work may be done directly for the owner of the property. Establishments primarily engaged in activities to construct buildings to be sold on sites that they own are known as operative builders, but also may be known as speculative builders or merchant builders. Operative builders produce buildings in a manner similar to general contractors, but their production processes also include site acquisition and securing of financial backing. Operative builders are most often associated with the construction of residential buildings. Like general contractors, they may subcontract all or part of the actual construction work on their buildings. There are substantial differences in the types of equipment, work force skills, and other inputs required by establishments in this sector. To highlight these differences and variations in the underlying production functions, this sector is divided into three subsectors. Subsector 236, Construction of Buildings, comprises establishments of the general contractor type and operative builders involved in the construction of buildings. Subsector 237, Heavy and Civil Engineering Construction, comprises establishments involved in the construction of engineering projects. Subsector 238, Specialty Trade Contractors, comprises establishments engaged in specialty trade activities generally needed in the construction of all types of buildings. Force account construction is construction work performed by an enterprise primarily engaged in some business other than construction for its own account and use, using employees of the enterprise. This activity is not included in the construction sector unless the construction work performed is the primary activity of a separate establishment of the enterprise. The installation and the ongoing repair and maintenance of telecommunications and utility networks is excluded from construction when the establishments performing the work are not independent contractors. Although a growing proportion of this work is subcontracted to independent contractors in the Construction Sector, the operating units of telecommunications and utility companies performing this work are included with the telecommunications or utility activities.

Download as PDF Login your account to download your results as a PDF Download as Excel Login your account to download your results as a Excel

Showing 2851–2900 of 13216 bids that are currently: Active.

Denotes bidding opportunities that have been amended

California - US Due Date
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Grind Existing Bridge Deck Sqyd 54
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Roseville Rd. & Butternut Dr. Intersection & Systematic Signalized Intersection Improvements - ASPHALT GRINDING
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Feb. 04, 2026
Corporate: Roseville Rd. & Butternut Dr. Intersection & Systematic Signalized Intersection Improvements - CRACK SEAL
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Feb. 04, 2026
Corporate: Roseville Rd. & Butternut Dr. Intersection & Systematic Signalized Intersection Improvements - STRIPING
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Feb. 04, 2026
Corporate: Roseville Rd. & Butternut Dr. Intersection & Systematic Signalized Intersection Improvements - PERVIOUS UNIT PAVERS
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Feb. 04, 2026
Pedestrian and Transit Improvements Project
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Sidewalk Repair Program
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 15, 2026
Corporate: Design-Build Services - Sherman Recovery Center - Grading & Asphalt Paving
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Design-Build Services - Sherman Recovery Center - Pavement Markings
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Clean Expansion Joint Lf 7
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Close Access, Deck Ea 8
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Prepare Concrete Bridge Deck Surface Sqft 474
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Furnish Polyester Concrete Overlay Cf 108
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 (F) - Place Polyester Concrete Overlay Sqft 474
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Access Opening, Deck Ea 8
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Access Opening, Soffit Ea 3
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Bridge Removal (Portion) Ls 1
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Detectable Warning Surface Sqft 53
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Minor Concrete (Curb And Gutter) Cy 7
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Minor Concrete (Curb, Sidewalk And Curb Ramp) Cy 9
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Concrete (Curb And Gutter) Lf 72
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Preformed Thermoplastic Pavement Marking Sqft 4,880
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Thermoplastic Pavement Marking Sqft 3,290
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Mobilization
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Temporary Pedestrian Access Route
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Temporary Concrete Washout
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Rock Blanket
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Lean Concrete Base Rapid Setting
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Grind Existing Bridge Deck
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 (F) - Structural Concrete \u2013 Bridge
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Clean Expansion Joint
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Close Access
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Deck
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Furnish Polyester Concrete Overlay
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 (F) - Place Polyester Concrete Overlay
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Access Opening Soffit
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Bridge Removal (Portion)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Detectable Warning Surface
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Minor Concrete (Curb and Gutter)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Minor Concrete (Curb Sidewalk and Curb Ramp)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Concrete (Curb and Gutter)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Hardscape Repairs
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 02, 2026
PAVEMENT RESTORATION RAINIER
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 14, 2026
Neighborhood Traffic Management Program Project
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 14, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Methyl Methacrylate Paint Green Colored Pavement Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Rock Blanket
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Close Access
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Prepare Concrete Bridge Deck Surface
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Furnish Polyester Concrete Overlay
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 (F) \u2013 Place Polyester Concrete Overlay
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026

Showing 2851–2900 of 13216 bids that are currently: Active.