live chat

SEARCH RESULTS - You are one step closer to winning a government bid!

Not the Results You Wanted?    MODIFY SEARCH Or Call (866) 459-8947 for help refining your search and account preferences.

The Sector as a Whole The construction sector comprises establishments primarily engaged in the construction of buildings or engineering projects (e.g., highways and utility systems). Establishments primarily engaged in the preparation of sites for new construction and establishments primarily engaged in subdividing land for sale as building sites also are included in this sector. Construction work done may include new work, additions, alterations, or maintenance and repairs. Activities of these establishments generally are managed at a fixed place of business, but they usually perform construction activities at multiple project sites. Production responsibilities for establishments in this sector are usually specified in (1) contracts with the owners of construction projects (prime contracts) or (2) contracts with other construction establishments (subcontracts). Establishments primarily engaged in contracts that include responsibility for all aspects of individual construction projects are commonly known as general contractors, but also may be known as design-builders, construction managers, turnkey contractors, or (in cases where two or more establishments jointly secure a general contract) joint-venture contractors. Construction managers that provide oversight and scheduling only (i.e., agency) as well as construction managers that are responsible for the entire project (i.e., at risk) are included as general contractor type establishments. Establishments of the "general contractor type" frequently arrange construction of separate parts of their projects through subcontracts with other construction establishments. Establishments primarily engaged in activities to produce a specific component (e.g., masonry, painting, and electrical work) of a construction project are commonly known as specialty trade contractors. Activities of specialty trade contractors are usually subcontracted from other construction establishments, but especially in remodeling and repair construction, the work may be done directly for the owner of the property. Establishments primarily engaged in activities to construct buildings to be sold on sites that they own are known as operative builders, but also may be known as speculative builders or merchant builders. Operative builders produce buildings in a manner similar to general contractors, but their production processes also include site acquisition and securing of financial backing. Operative builders are most often associated with the construction of residential buildings. Like general contractors, they may subcontract all or part of the actual construction work on their buildings. There are substantial differences in the types of equipment, work force skills, and other inputs required by establishments in this sector. To highlight these differences and variations in the underlying production functions, this sector is divided into three subsectors. Subsector 236, Construction of Buildings, comprises establishments of the general contractor type and operative builders involved in the construction of buildings. Subsector 237, Heavy and Civil Engineering Construction, comprises establishments involved in the construction of engineering projects. Subsector 238, Specialty Trade Contractors, comprises establishments engaged in specialty trade activities generally needed in the construction of all types of buildings. Force account construction is construction work performed by an enterprise primarily engaged in some business other than construction for its own account and use, using employees of the enterprise. This activity is not included in the construction sector unless the construction work performed is the primary activity of a separate establishment of the enterprise. The installation and the ongoing repair and maintenance of telecommunications and utility networks is excluded from construction when the establishments performing the work are not independent contractors. Although a growing proportion of this work is subcontracted to independent contractors in the Construction Sector, the operating units of telecommunications and utility companies performing this work are included with the telecommunications or utility activities.

Download as PDF Login your account to download your results as a PDF Download as Excel Login your account to download your results as a Excel

Showing 2051–2100 of 12950 bids that are currently: Active.

Denotes bidding opportunities that have been amended

California - US Due Date
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 6\u201D Two-Component Paint Traffic Stripe (Broken 17-7)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Paint Pavement Marking (2-Coat)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 6\u201D Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 6\u201D Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8-4)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 8\u201D Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 8\u201D Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Painted Traffic Stripe
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Painted Pavement Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Thermoplastic Traffic Stripe
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Modify Signal & Lighting, and Construct ADA Ramps \u2013 Remove Thermoplastic Pavement Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 07, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Temporary Traffic Stripe (Paint)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Folsom Area Stormwater Improvements - Harrison\/Treat Box Sewers and Connecting Auxiliary Sewers - Striping
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Replace Tuolumne Meadows Wastewater Treatment Plant - Painting & Coatings
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 09, 2026
Corporate: Asphalt Concrete Pavement Upgrade - Thermoplastic Traffic Striping & Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 13, 2026
Corporate: Asphalt Concrete Pavement Upgrade - Painted Traffic Striping & Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 13, 2026
Corporate: Asphalt Concrete Pavement Upgrade - Remove Pavement Marking & Traffic Stripes
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 13, 2026
Corporate: Asphalt Concrete Pavement Upgrade - Pavement Marker
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 13, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Merced County Office of Educatiion Los Banos VCS and Merced VCS New HVAC and Site Work - Painting
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Dec. 23, 2025
Remove and Replace Pavement Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 13, 2026
Corporate: Grass Valley Charter School Window Replacement AT Grass Valley Charter School - painting
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Remove Pavement Marker
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Pavement Marker (Retroreflective)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Remove Roadside Sign
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 8\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 8\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 12\" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Remove Thermoplastic Traffic Stripe
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Remove Thermoplastic Pavement Marking
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Rumble Strip (Asphalt Concrete Pavement)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Rumble Strip (Concrete Pavement)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 12\" Rumble Strip (Asphalt Concrete Pavement)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 12\" Rumble Strip (Concrete Pavement)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 8\" Traffic Stripe Tape With Contrast (Warranty) (Broken 12-3)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 12\" Traffic Stripe Tape With Contrast (Warranty)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Contrast Stripe Paint (2-Coat)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Traffic Stripe Tape With Contrast (Warranty)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Traffic Stripe Tape With Contrast (Warranty) (Broken 17-7)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 6\" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 8\" Traffic Stripe Tape With Contrast (Warranty)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: San Gabriel High School Alternations Project - Painting
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Feb. 06, 2026
Corporate: Cater Reservoir Resiliency Project - painting and coating
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Place HMA (Type A), Minor Concrete Sidewalk, Lighting (City Streets) \u2013 Temporary Pavement Marking (Paint)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Corporate: Place HMA (Type A), Minor Concrete Sidewalk, Lighting (City Streets) \u2013 Temporary Traffic Stripe (Paint)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Corporate: Place HMA (Type A), Minor Concrete Sidewalk, Lighting (City Streets) \u2013 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste)
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Roadway Striping
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Corporate: Benihana - Exterior Painting
23 - Construction
(to see the full NAICS category code login  or  upgrade)
Dec. 23, 2025

Showing 2051–2100 of 12950 bids that are currently: Active.