live chat

SEARCH RESULTS - You are one step closer to winning a government bid!

Not the Results You Wanted?    MODIFY SEARCH Or Call (866) 459-8947 for help refining your search and account preferences.

Industries in the Plastics and Rubber Products Manufacturing subsector make goods by processing plastics materials and raw rubber. The core technology employed by establishments in this subsector is that of plastics or rubber product production. Plastics and rubber are combined in the same subsector because plastics are increasingly being used as a substitute for rubber; however the subsector is generally restricted to the production of products made of just one material, either solely plastics or rubber. Many manufacturing activities use plastics or rubber, for example the manufacture of footwear, or furniture. Typically, the production process of these products involves more than one material. In these cases, technologies that allow disparate materials to be formed and combined are of central importance in describing the manufacturing activity. In NAICS, such activities (the footwear and furniture manufacturing) are not classified in the Plastics and Rubber Products Manufacturing subsector because the core technologies for these activities are diverse and involve multiple materials. Within the Plastics and Rubber Products Manufacturing subsector, a distinction is made between plastics and rubber products at the industry group level, although it is not a rigid distinction, as can be seen from the definition of Industry 32622, Rubber and Plastics Hoses and Belting Manufacturing. As materials technology progresses, plastics are increasingly being used as a substitute for rubber; and eventually, the distinction may disappear as a basis for establishment classification. In keeping with the core technology focus of plastics, lamination of plastics film to plastics film as well as the production of bags from plastics only is classified in this subsector. Lamination and bag production involving plastics and materials other than plastics are classified in the NAICS Subsector 322, Paper Manufacturing.

Download as PDF Login your account to download your results as a PDF Download as Excel Login your account to download your results as a Excel

Showing 1–50 of 160 bids that are currently: Active.

Denotes bidding opportunities that have been amended

Alabama - US Due Date
Vault Cooler
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 19, 2025
 
 
Arkansas - US Due Date
M819 Foam Cushioning
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
 
 
California - US Due Date
Corporate: Construct Truck Climbing Lanes & Replace Bridges \u2013 Traffic Drum
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Wall Construction, Earthwork, and Drainage - Rubberized Hot Mix Asphalt (Gap Graded)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Wall Construction, Earthwork, and Drainage - 12\" Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Wall Construction, Earthwork, and Drainage - 12\" Non-Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 2\" Plastic Pipe (Schedule 40)(Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 Joint Seal (Silicone)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 Isolation Joint Seal (Preforemed Comoression)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 Joint Seal (MR 1\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 Joint Seal (MR 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 6\" Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Wall Construction, Earthwork, and Drainage \u2013 Rubberized Hot Mix Asphalt (Gap Graded)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Wall Construction, Earthwork, and Drainage \u2013 12\" Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: 01-0J8014 Wall Construction, Earthwork, and Drainage \u2013 12\" Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: 01-0J8014 Wall Construction, Earthwork, and Drainage \u2013 12\" Non-Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 1\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 Joint Seal (Mr 1\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 Joint Seal (Mr 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 Joint Seal (Mr 2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 3\/4\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 2\" Plastic Pipe (Class 315) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 Rubberized Hot Mix Asphalt (Gap Graded)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 Joint Seal (Mr 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Bridge Rehabilitation and Replacement Program \u2013 Joint Seal (Type A-Mr 1\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Bridge Rehabilitation and Replacement Program \u2013 Joint Seal (Type A-Mr 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Bridge Rehabilitation and Replacement Program \u2013 Joint Seal (Type B-Mr 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Bridge Rehabilitation and Replacement Program \u2013 Joint-Seal (Type B'-Mr 2 1\/2\") --
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Bridge Rehabilitation and Replacement Program \u2013 Joint Seal (Type B-Mr 2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 (F) - 2\" Plastic Pipe (Class 315) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Joint Seal (Mr 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Joint Seal (Mr 1\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Joint Seal (Mr 1 1\/2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 Joint Seal (Mr 2\")
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
PACKING ASSEMBLY
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 26, 2025
FILM - VINYL, WHITE GLOSS CALENDERED
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 23, 2025
EXTINGUISHER,FIRE
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 29, 2025
Corporate: Modify Overhead and Roadside Sign Panels \u2013 (F) \u2013 1 1\/2\u201D Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Modify Overhead and Roadside Sign Panels \u2013 (F) \u2013 2\u201D Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Route 101 Bicycle and Pedestrian Overcrossing \u2013 2\" Plastic Pipe (Schedule 40)(Supply Line) *
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Dec. 18, 2025
Corporate: Wall Construction, Earthwork, and Drainage \u2013 12\" Non-Perforated Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 08, 2026
Corporate: Retaining Walls, Minor Concrete, Earthwork, And Modify Electrical \u2013 4\" Plastic Pipe Underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Corporate: Retaining Walls, Minor Concrete, Earthwork, And Modify Electrical \u2013 4\" plastic pipe underdrain
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 06, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 3\/4\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 1\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 1 1\/2\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - 2 1\/2\" Plastic Pipe (Class 315) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, CB, Replace POC, & CMS System \u2013 (F) - Pvc Pipe Conduit (Sleeve)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 (F) - 3\/4\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026
Corporate: Cold Plane, RHMA-G, Polyester Concrete Overlay, Cb, Replace POC, & CMS System \u2013 (F) - 1\" Plastic Pipe (Schedule 40) (Supply Line)
32 - Manufacturing
(to see the full NAICS category code login  or  upgrade)
Jan. 22, 2026

Showing 1–50 of 160 bids that are currently: Active.